A remodeled primary bathroom with a soaking tub and a walk-in shower

American Standard Home Additions & ADU Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansProudly serving local communities 21+ years
A remodeled hall bathroom with patterned floor tile and painted walls
A low-threshold walk-in shower with a bench and grab bar
A powder room with botanical wallpaper and a stone sink
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A built-in window seat in a bay window
A dining nook with a built-in banquette
A home office with a built-in desk and shelves
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

American Standard Home Additions & ADU: The Los Angeles Owner’s Guide

American Standard home additions and ADU projects in Los Angeles typically run $53,100 to $153,400 when built through a licensed general contractor, with ADUs starting around $106,200 for a detached unit. Elmstead Remodeling is an independent contractor and not affiliated with American Standard, but we plan, permit, and build additions that coordinate with the American Standard fixtures and finishes already in your home. Most homeowners reach out after realizing their current house cannot flex far enough: a second child arrives, an aging parent needs a ground-floor suite, or a home office has taken over the dining table and nobody remembers where the good plates went.

Call (949) 850-9896

What usually brings the call is not a failed stud or a cracked slab. It is the moment the bathroom line at 7 a.m. hits three people deep, or the day someone realizes the garage has not held a car since 2019. The house did not break. It simply stopped fitting. Our job is to measure that gap carefully, put a written price in front of you before any work starts, and build the room or unit that closes it.

Which American Standard Models This Applies To

A freestanding soaking tub in a remodeled primary bathroom

American Standard does not manufacture room additions or ADUs, so there is no “model number” to match the way you would match a faucet cartridge or a toilet tank valve. The compatibility question is really about the fixtures, trim, and plumbing rough-ins inside the addition. If your existing home has American Standard toilets, lavatories, tubs, or shower valves, we spec the new addition to accept the same series so replacement parts stay simple five years down the road.

Here is the compatibility gotcha we see in Los Angeles homes built before 2010: older American Standard tub and shower valves were roughed in with 1/2-inch copper and no integral stops, while newer additions and ADUs commonly call for PEX with shut-off stops at the valve. We map the existing rough-in before the plans are final, not after the drywall is up. For faucets and lavatories, we check whether the home uses the standard 4-inch centerset pattern or the less common 8-inch widespread, because that single measurement controls which American Standard trims will drop in without a fight. On the OEM-versus-aftermarket question: we use American Standard OEM trim and valves inside the addition when the rest of the house runs American Standard, because a consistent parts shelf saves you a plumber’s diagnostic trip later. For rough-in components where American Standard does not produce a part, we use code-listed equivalents from manufacturers whose warranties we can hand you in writing.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Signs Your American Standard Home Additions & ADU Is Failing

Additions and ADUs do not usually fail all at once. They send signals first, and most of them are quiet:

  • Doors that stick in summer and swing free in winter. Los Angeles clay soil expands and contracts with moisture, and a foundation moving unevenly will telegraph through door frames first. We see this most in the San Fernando Valley, where soil swings are extreme.
  • Drywall cracks that keep coming back after patching. A crack that returns within a season is usually structural movement, not a bad mud job. Hairline cracks along ceiling corners are common and mostly cosmetic; stair-step cracks at window corners deserve a closer look.
  • A floor that slopes toward one wall. If a marble drops and rolls, the subfloor or foundation has shifted. In an existing addition, this often traces back to a permit pulled without a soils report.
  • Moisture or mildew at the addition’s exterior wall. This is a flashing or weep-screed failure, common where a previous addition met the original stucco without proper transition detailing. In Los Angeles’s winter rain and summer fog, that detail matters.
  • Electrical circuits that trip when the new room is fully loaded. Older panels were not sized for a bedroom, a mini-split, and a home office on one 15-amp circuit. We check the panel capacity before we build, not after the first brownout.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

A walk-in shower with large-format tile and a built-in niche

Home additions in Los Angeles run $53,100 to $153,400 depending on square footage, foundation work, kitchen or bath inclusion, and how much the existing roofline has to change. A detached ADU with its own kitchen and bath starts around $106,200 and stretches to $259,600 for a two-bedroom unit with separate utility connections. Garage conversions, which are simpler because the shell already exists, land between $35,400 and $94,400.

What drives the range is not the drywall or the paint. It is the foundation type (raised versus slab, and what the soils report says), the distance from the existing electrical panel to the new structure, and whether the addition ties into the existing roof or gets its own. Every Elmstead Remodeling project in Los Angeles includes a written price before any work starts, with line items for demolition, framing, rough plumbing and electrical, drywall, finishes, and the named-brand materials we install. We use cabinet lines from KraftMaid and Wellborn, countertops from Cambria and Silestone, and fixtures from Kohler, Moen, and Grohe, so the warranties travel with the finished project. The written price is the promise, and the 365-Day Done Right Promise backs it: if something is not done right after the job is complete, we make it right.

DIY or Call Us?

An addition or ADU is not a DIY project, full stop. The dangerous parts are not glamorous: a mistied roof connection leaks for years before you see the stain; an undersized beam sags slowly enough to look “normal” until it is not; and a foundation poured without a proper soils report in Los Angeles’s expansive clay will shift within two seasons. We have torn out work where the framing looked fine from the street and was not fine at the ridge.

What you can safely do yourself is the planning homework: measure the lot, check your zoning letter from the City of Los Angeles Department of Building and Safety, and walk the space with photos of what you want. Bring us your notes and your questions. Then call (949) 850-9896 and ask for a written estimate. We will walk the property, check the panel, look at the soils, and tell you what the project actually requires before any money changes hands.

FAQs

A remodeled hall bathroom with subway tile and a floating vanity

Getting started with Elmstead

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · Written quotes before work starts response · free estimates
Call (949) 850-9896
Areas We Serve

Request a Free Estimate

Tell us what you need - Elmstead Remodeling responds fast. No obligation.

When you send us your details, you acknowledge our Privacy Policy and agree to be contacted by call, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch