







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Marina del Rey
A full kitchen remodel in Marina del Rey typically runs $14,000 – $45,000, with most projects taking 4 – 8 weeks from permit approval to final walkthrough. Call (949) 850-9896 to schedule your free estimate and receive a written price before any work starts.
We serve Marina del Rey from our Los Angeles office, and our crews know the difference between a kitchen on Admiralty Way facing the channel and one tucked inland near Washington Boulevard. That difference matters for what goes into your cabinets, not just what color you pick. The salt-laden marine layer here corrodes standard hinges and countertop clips within a few years. We specify marine-grade finishes and stainless hardware because we’ve opened enough 1990s refaces to know what fails.
Our Kitchen Remodeling team handles everything from single-family homes near Fiji Way to condos in the Silver Strand towers. We pull the county lessor approvals, coordinate with your HOA, and schedule quiet hours around your family’s routine. Shoe covers and drop cloths on every visit. A photo of the clean-up before we leave. And the 365-Day Done Right Promise on every completed project.
Why Elmstead Remodeling Is Marina del Rey’s Preferred Kitchen Remodeling Company

Elmstead Remodeling, a Cedarwell company founded in 2005, has built its reputation in Marina del Rey on one thing: showing up the way we’d want someone to show up in our own home. Background-checked, uniformed technicians. Quiet tools during nap and school hours where possible. Pet-safe product choices where available.
Our phones are answered by a live person 24/7. Not a voicemail box. Not a bot. Not a callback on Monday. When you call (949) 850-9896, someone picks up.
We know Marina del Rey’s specific conditions. The engineered fill beneath those 1970s towers. The county leasehold structure that adds a permit layer no inland city has. The Coastal Development Permit triggers that catch contractors who’ve never worked coastal. We’ve navigated these for Marina del Rey homeowners before, and we build that knowledge into every written price we deliver.
Graham Stein leads our operation with a simple standard: the Cedarwell Care Promise. Clean up like it’s our own home. Ask before we move or touch anything. Respect the family’s time and quiet hours. Explain the price before the work. Every project. No exceptions.
Styles & brands we work with







Cabinet Installation in Marina del Rey
Cabinet Installation in Marina del Rey demands more than measuring twice and leveling once. The salt air here finds every unsealed joint, every standard steel hinge, every clip not rated for coastal exposure. We see swollen base cabinets in marina-front units where humidity wicks up from balcony-adjacent walls, and we spec accordingly. A typical cabinet installation in Marina del Rey runs $4,000 – $13,000, depending on linear footage, finish grade, and whether we’re working with post-tension slab constraints common in 1960s – 80s towers.
Frameless Boxes for Tight Condo Kitchens
Most Marina del Rey kitchens sit in 90 – 120 square foot footprints. KraftMaid and Wellborn frameless cabinets gain 10 – 15% usable interior volume versus face-frame construction. That matters when you’re storing pots in a Silver Strand galley. We anchor to blocking, not just drywall, because engineered-fill buildings shift differently than slab-on-grade homes.
Marine-Grade Finishes That Last
Standard catalyzed varnish cracks at salt-air exposure within 3 – 4 years. We specify conversion varnish with UV inhibitors and moisture barriers, or thermally fused laminate where the HOA allows. The hardware is 316 stainless or hot-dip galvanized. It costs more upfront. It costs far less than replacing corroded hinges in year five.
Countertop Installation in Marina del Rey

Countertop Installation in Marina del Rey means accounting for buildings that move. The engineered fill beneath Admiralty Way towers settles differently than bedrock in Santa Monica. We’ve seen quartz slabs crack where installers used rigid epoxy instead of flexible silicone at the backsplash joint. A typical countertop installation here runs $2,000 – $6,500, with Cambria, Silestone, and Caesarstone making up most of our specs for their non-porous performance in humid kitchens.
Substrate Inspection Before Template
We pull the old top and inspect the cabinets beneath before we laser-template. In a 1974 tower, you might find corroded rebar bleed-through or a sagging post-tension slab. Finding that before the new Cambria arrives saves a week of change orders. We photograph what we find and talk through options before any material gets ordered.
Coastal-Rated Sink Mounting
Undermount sinks in Marina del Rey need stainless clips and marine-grade silicone, not the zinc-plated hardware that ships standard. The marine layer attacks everything. We seal the sink deck, the faucet escutcheons, and the dishwasher air gap with products rated for continuous moisture exposure. It’s a detail you don’t see. It’s a detail you don’t have to think about in year six.
Trusted Brands We Service in Marina del Rey
We install cabinets from KraftMaid and Wellborn, countertops from Cambria, Silestone, and Caesarstone, and fixtures from Kohler, Moen, and Grohe. These aren’t placeholder names. They’re manufacturers whose warranties travel with your project, whose spec sheets we file with your HOA, and whose local reps we call when a slab needs expediting. For Marina del Rey customers, that means replacement parts available without cross-country shipping, and finish matches that don’t rely on memory. We also work with Abodu and Dvele for accessory dwelling unit and modular component integration where your project scope expands. Every brand we name is one you can research independently, verify reviews on, and hold accountable if something fails.
See the difference
Before
After
Before
After
Before
AfterCommon Kitchen Remodeling Problems We See in Marina del Rey Homes
- Corroded fasteners in salt-air kitchens. Standard cabinet hinges and countertop clips rust through within 3 – 5 years of exposure to Marina del Rey’s persistent marine layer. We replace with 316 stainless or hot-dip galvanized hardware rated for coastal conditions, and we seal every penetration point with marine-grade silicone.
- County lessor approval delays. Because nearly every Marina del Rey parcel sits on LA County-leased land, kitchen remodels need lessor sign-off layered on top of standard municipal permits. Contractors who skip this step face stop-work orders mid-project. We build county coordination into our timeline from day one.
- Hidden subfloor damage in 1970s towers. Pulling cabinets on engineered Ballona fill often reveals corroded rebar, spalling concrete, or compromised post-tension slabs. We budget for geotechnical assessment and structural remediation in our written price, not as a surprise add-on after demo.
- Coastal Development Permit triggers. Kitchen work that touches exterior venting, common-area walls, or window frames in marina-front buildings can require California Coastal Commission review. We identify these triggers during pre-construction planning, not after the drywall’s open.
Pricing for Kitchen Remodeling in Marina del Rey, CA
We give a written price before any work starts, every time, on every project. No estimates that grow after the crew arrives. For Marina del Rey, our kitchen remodeling prices reflect coastal-spec materials and the permit complexity unique to county-leased land.
| Project Type | Price Range |
|---|---|
| Kitchen Remodel (coastal-spec) | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
What moves a project toward the top of the range: structural remediation in 1960s – 80s towers, custom cabinetry, waterfall-edge quartz, appliance relocation requiring plumbing or electrical rough-in changes, and county lessor approval complexity. What keeps it lower: straightforward replacement in good-condition substrate, stock cabinet sizes, and minimal layout changes. Call (949) 850-9896 for your exact quote. Estimates are free.
We Also Serve Cities Near Marina del Rey
Our crews work throughout the Westside, including Kitchen Remodeling in Marina del Rey and neighboring Venice, Culver City, Santa Monica, and El Segundo. Each city has its own permit landscape and housing stock, and we adjust our specs accordingly. Santa Monica’s rent control overlay affects tenant improvement timelines. Venice’s single-family inventory faces different subfloor conditions than Marina del Rey’s tower stock. We know the distinctions because we work in all of them.
Serving Marina del Rey, CA - Our Local Coverage Area
We’re based in the Marina del Rey area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About Kitchen Remodeling in Marina del Rey
Yes. Because the majority of Marina del Rey land is county-leased, your remodel needs LA County lessor approval in addition to standard city building permits. We handle both layers as part of our pre-construction process, and we build the timeline into your written price. Call (949) 850-9896 to discuss your specific building’s requirements.
316 stainless steel or hot-dip galvanized hardware, sealed with marine-grade silicone at every penetration. Standard zinc-plated or catalyzed finishes corrode within 3 – 5 years here. We specify coastal-rated materials on every Marina del Rey job, and we document the spec sheet for your HOA file. Call (949) 850-9896 for details on what’s going into your kitchen.
The coastal-spec kitchen runs 15 – 25% higher upfront due to marine-grade finishes, stainless hardware, corrosion-resistant fasteners, and moisture-barrier substrates. The inland spec costs more within a decade because replacement, water damage remediation, and failed joint repair exceed the initial savings. We itemize both approaches in our written price so you choose with full information. Call (949) 850-9896 to see the line-item comparison.
Corroded rebar bleed-through and compromised post-tension slabs are more common than homeowners expect. The engineered fill beneath these towers shifts, and decades of salt-air exposure attacks structural steel. We find it during cabinet removal, not after the new materials arrive, because we budget substrate inspection into our demo phase. Call (949) 850-9896 and we’ll walk through what we check before ordering your cabinets.
Only if your work touches exterior elements: common-area walls, window frames, venting, or anything visible from the marina. Pure interior cabinet and countertop replacement typically doesn’t trigger it. We identify Coastal Development Permit requirements during our first site visit and flag them in your written price. Call (949) 850-9896 to confirm whether your specific project needs this layer.
Written by Graham Stein, Owner at Elmstead Remodeling, serving Marina del Rey and the greater Los Angeles area.











