







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Construction in San Jose, CA | Elmstead Remodeling
We provide independent CGI cabinetry and quartz surface service across San Jose, from full kitchen remodels to single-door replacements and countertop re-templating. The one thing that makes our CGI work here different is that we treat San Jose’s soft-story retrofit calendar and expansive adobe clay as part of the job spec, not an afterthought. Our crew has installed and serviced CGI lines in hundreds of San Jose kitchens, and we hold no CGI authorization or partnership. Call (949) 850-9896 for a free estimate.
Why San Jose Residents Choose Us for CGI Service

We’re an independent shop that knows CGI’s fit tolerances, hinge geometry, and how the finishes behave in this valley’s housing stock. Graham Stein, our owner, learned framing, finish work, and project sequencing at Los Angeles Trade-Technical College, where reading a set of plans came before picking up a tool. That habit shows up in how we approach CGI work: we check the boring pattern before ordering a replacement door, and we shim a racked cabinet run before templating a quartz top over it.
Every project gets shoe covers and drop cloths inside the house, a written price before any work starts, and a photo of the clean-up before the crew leaves. We use OEM CGI hinges, drawer glides, and replacement doors whenever the box is sound. When it isn’t, we say so plainly and recommend a quality replacement rather than a costly rescue. For families across San Jose looking for a General Contractor in San Jose, that directness is the reason they call us back.
Styles & brands we work with







Common CGI Construction Problems We Solve in San Jose
- Thermofoil and laminate door skins peeling at the edges. Slab-on-grade East San Jose homes wick moisture through the valley’s expansive clay, and CGI thermofoil doors delaminate when humidity swings hard. We strip the failed skin, assess the substrate, and either re-skin or replace the door with factory-matched product.
- Full-overlay CGI doors swelling and binding. San Jose’s adobe clay heaves and settles with rain and drought cycles, and full-overlay doors on a shifted slab or post-and-pier floor bind at the corners. We re-shim the cabinet run to level before touching a hinge, which stops the binding instead of masking it.
- Engineered quartz cracking at unsupported overhangs and sink cutouts. When the cabinet run beneath has racked or settled, CGI quartz carries the strain and fractures. We see this constantly in Willow Glen and Naglee Park bungalows. We re-level the boxes, add support where the overhang needs it, and re-templated the new top to the corrected plane.
- Musty odor and finish failure on CGI boxes near Alviso and North San Jose. Bay-mud-adjacent slab moisture and poor crawlspace ventilation push damp air into unventilated walls. CGI cabinet boxes tight against those walls pick up odor and lose finish adhesion. We correct the ventilation first, then address the affected boxes.
- CGI cabinets racked by soft-story retrofit sequencing. In 1960s-70s tuck-under apartment buildings, the retrofit crew unbolts carport frames and the building shifts fractions of an inch. Existing CGI cabinet runs inside the units above often rack. We come in after the retrofit and bring the runs back to true before countertops go down.
CGI Service in San Jose: What Local Conditions Mean for Your Equipment

Because San Jose’s 2016 mandatory soft-story retrofit ordinance runs on a compliance calendar across thousands of 1960s-70s tuck-under apartment buildings, CGI cabinet and finish work here often rides along with seismic retrofit scopes in the same buildings. That’s a sequencing reality contractors in neighboring South Bay cities simply don’t face at this volume. When a retrofit crew opens walls and unbolts carport framing, the building moves slightly. CGI cabinets in the units above go out of square. Doors that closed cleanly start to bind. Quartz tops set over the runs can crack at the sink cutout.
On a 1968 tuck-under fourplex off Naglee Park, our crew was brought in after the soft-story retrofit crews finished bolting the carport frame. The owner wanted the downstairs units re-kitted while the walls were already open. We templated new CGI quartz tops over the existing CGI shaker boxes, replaced four delaminated thermofoil doors, and re-shimmed the cabinet runs that had racked on the settled post-and-pier floor before the countertops went down. That sequence – re-level, then template, then install – is the only way to avoid a cracked top six months later.
CGI Models & Products We Service in San Jose
We work on the full CGI product range we see in our Bathroom Remodeling in San Jose and kitchens. That includes CGI Euro-style frameless full-overlay cabinets with Blum-style clip-top hinges – common in Cambrian and Berryessa kitchen refreshes – along with CGI shaker and slab-door cabinet lines with plywood-box construction and soft-close drawers. We service CGI quartz slab program installations that were cut and templated by local fabricators. For East San Jose rental and ADU kitchens, we handle CGI laminate and thermofoil cabinet door options, including edge-band repair and full door replacement.
On parts, our approach is simple. We source OEM CGI hinges, drawer glides, and replacement doors whenever the cabinet box is structurally sound, because factory hardware fits the existing boring pattern and preserves the run. We’ll tell a homeowner plainly when a CGI box is too far gone from water damage or racking. At that point, a quality aftermarket or semi-custom replacement is the honest call – not a costly rescue of a failing carcass. For broader brand context, visit our CGI sales & service page.
See the difference
Before
After
Before
After
Before
AfterCGI Service Pricing in San Jose

Every estimate is written, line-itemed, and delivered before any work starts. No numbers change after the crew arrives. Here’s what to expect for common CGI-related scopes in San Jose:
| Service | San Jose Price Range |
|---|---|
| Kitchen Remodel | $16,520 – $53,100 |
| Small Kitchen Remodel | $10,620 – $23,600 |
| Cabinet Installation | $4,720 – $15,340 |
| Countertop Installation | $2,360 – $7,670 |
| Backsplash Installation | $945 – $2,950 |
| Kitchen Island Installation | $3,540 – $11,800 |
What drives the price: the condition of the existing boxes, whether the floors have heaved and need leveling, and whether the job is a single-door replacement or a full tear-out. We cover all of San Jose, from Naglee Park to East San Jose. Call (949) 850-9896 for a written, no-obligation quote. The written scope is the promise – if it is not on the paper, we have not agreed to it yet.
Serving San Jose, CA - Our Local Coverage Area
We’re based in the San Jose area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs – CGI Construction in San Jose
It depends on the substrate beneath the failed skin. Thermofoil and laminate doors peel when slab moisture from San Jose’s adobe clay pushes humidity into the kitchen. If the MDF core is still sound, we can strip and re-skin the door. If the core has swelled or crumbled, replacement doors with factory-matched CGI thermofoil are the durable call. Call (949) 850-9896 and we’ll assess your doors on site.
If the cabinet runs beneath the tops have racked from the slab movement, yes, the quartz can crack at sink cutouts and unsupported overhangs. We re-level the boxes and correct the cabinet plane before templating the new top. Quartz is rigid; it needs a level, continuously supported base. In a heaved Cambrian slab, that means fixing the boxes first, not shimming the countertop.
Bay mud compresses under load, which means the ADU’s foundation is likely on caissons or deep piles. If the building settles even slightly, your CGI cabinets and quartz tops move with it. We frame our cabinet installs to tolerate that movement, and we template quartz only after the structure has settled into its final plane. For an exact plan, call (949) 850-9896 – the estimate visit is free.
Yes, when the cabinet line is still in production. We can order factory-matched CGI doors and drawer fronts in the same species, finish, and overlay style as your existing run. Color matching across an older finish takes a physical sample; we’ll pull a door and send it for matching. The box condition matters too. If the existing boxes have racked on the post-and-pier floors common in Willow Glen, we’ll level them before any new fronts go on.
The retrofit unbolts and re-bolts the carport framing, and the building shifts fractions of an inch. CGI cabinet runs inside the units above can rack, doors can bind, and quartz tops can crack at cutouts. We sequence our work to follow the retrofit crew – re-level the runs, replace damaged doors, and only then template new countertops. This is a San Jose-specific situation we handle regularly; call (949) 850-9896 to schedule an assessment after your retrofit is complete.
Service Areas Near San Jose
We work throughout San Jose service area and its surrounding communities, including Los Angeles, San Diego, and Sacramento. For CGI work north of here, see CGI service in San Francisco and CGI service in Fresno.
Book Your CGI Service in San Jose Today
If your CGI cabinets or quartz surfaces need attention anywhere in San Jose, we’ll send a background-checked crew, protect your floors and the walk to the job, and hand you a written price before any work starts. Call (949) 850-9896 to schedule your free estimate.
Written by Graham Stein, Owner at Elmstead Remodeling, serving San Jose since 2005.












